Video index
Call to Order
2. Consider a project update on the West Lucas Road Reconstruction Project including alternative designs and options for drainage. (Design Engineer Christopher Meszler, BCC Engineering, Public Works Director Scott Holden, Contract Engineer Joe Grajewski, Engineering Management Analyst Patrick Hubbard)
Jul 28, 2022 City Council Special Meeting
Full agenda
Share this video
Video Index
Full agenda
Share
Call to Order
2. Consider a project update on the West Lucas Road Reconstruction Project including alternative designs and options for drainage. (Design Engineer Christopher Meszler, BCC Engineering, Public Works Director Scott Holden, Contract Engineer Joe Grajewski, Engineering Management Analyst Patrick Hubbard)
Link
Start video at
Social
Embed
<iframe title="Swagit Video Player" width="640" height="360" src="https://lucastx.new.swagit.com/videos/177954/embed" frameborder="0" allowfullscreen></iframe>
Disable autoplay on embedded content?
Download
Download
Download Selected Item